Omar Yassin Salah & Co
Alamaq for mining
Excavation works, Phosphate Mining, and Sieving (Feb 1st - Dec 31st, 2011).
Excavation works, Phosphate Mining, and Sieving (Feb 1st - Dec 31st, 2013).
Excavation works, Phosphate Mining, and Sieving (Jan 1st - Oct 31st, 2014).
Stockpiling material and Phosphate Mining Contract from layers (A1, A2, A3). Eshidiya Mine.
Stockpiling upper material, Phosphate Mining, Sieving, and Loading (S2) in (UH No.2).
Stockpiling upper material, Phosphate Mining, Sieving, and Loading (S2) in (UH No.2). Eshidiya Mine. Quantity: approximately (8,787,400 m3).